Waste to Energy Power Plant Project

T-11 Corporation President and Chief Executive Officer Frederick Tuazon (extreme left) finalize talks with Chinese Contractor Hung Ru and his team: Joseph Ong; Harvy Tan; Engr. Allen Ong; and Joseph Ayod during a lunch working meeting at Taki Yama along Kennon Road in Baguio City.
T-11 Corporation is the proponent of a P7.5 billion renewal energy project that would generate 45 megawatts of power.

Amianan Balita Ngayon